Atlas of details · Other nodes

Pile head into the cap

D.01Bored pile foundation
123456

How this node works

The pile head is trimmed back to sound concrete and embedded in the cap; the longitudinal bars are bent and anchored into it, so the column load passes continuously from the cap into the shaft.

Key points

  • Column
  • Pile cap
  • Bored pile
  • Pile bars anchored into the cap
  • Cap reinforcement
  • Trimmed (scabbled) head

Conceptual, language-neutral drawing for study and orientation — not an execution drawing. Dimensions and verifications belong to the designer.

Pile head into the cap — Bored pile foundation | Architheca