Atlas of details · Other nodes
Infill between the piles (plan)
How this node works
In plan the piles stand proud and the soil between them arches onto them; a shotcrete infill with a mesh closes the gap and takes the local push, while a weep lets any water out. The closer the piles, the more the soil arches and the lighter the infill can be.
Key points
- Pile
- Pile (adjacent)
- Soil arching
- Shotcrete infill
- Welded mesh
- Weep hole
Conceptual, language-neutral drawing for study and orientation — not an execution drawing. Dimensions and verifications belong to the designer.