How this node works
At the foot the wall is tied to the foundation by bent starter bars; the waterproofing is turned up onto the wall and a water-stop closes the joint, so soil and groundwater stay out and the cover protects the steel.
Key points
- Foundation
- R.C. wall
- Bent starter bars
- Water-stop at the joint
- Waterproofing turned up
- Cover toward the soil
Conceptual, language-neutral drawing for study and orientation — not an execution drawing. Dimensions and verifications belong to the designer.