Rules implementing the National Energy Plan (rational use of energy)
Summary
TAV. 00Law 10 of 9 January 1991 implemented the National Energy Plan: Title I deals with the rational use of energy and renewable sources, Title II with energy consumption in public and private buildings, and it repealed Law 373/1976. Published in Official Gazette No. 13 of 16 January 1991 (S.O. 6), in force from 17 January 1991 (Title II from 15 July 1991), it is formally in force, but many of its building provisions have been repealed by Legislative Decree 192/2005 and later decrees: the technical report that still bears its name now sits in art. 8 of Legislative Decree 192/2005. What remains most in use are the condominium majorities for energy-saving interventions (art. 26).
Scope of application
TAV. 01Energy consumption in public and private buildings of any use, and the operation and maintenance of existing systems (art. 25); for the renovation of existing buildings, application is graduated by type of intervention. Design requirements and performance limits are now those of Legislative Decree 192/2005 and its implementing decrees.
In depth
TAV. AA 1991 law that still gives its name to a document
Law 10 of 9 January 1991 — «Rules implementing the National Energy Plan on the rational use of energy, energy saving and the development of renewable energy sources» — has two souls. Title I (arts. 1–24) is an energy-policy law: it defines renewable sources and declares their use to be in the public interest, provides capital grants for investments and creates the energy manager for large consumers. Title II (arts. 25–37) is the part that concerns design: it regulates energy consumption in public and private buildings, whatever their use, and repealed Law 373/1976 on limiting energy consumption for heating in buildings.
What is still in force
| Article | Content | Status today |
|---|---|---|
| Art. 25 | Scope: energy consumption in public and private buildings; for the renovation of existing buildings, application graduated by the types of intervention of art. 31 of Law 457/1978 | In force |
| Art. 26 | Design and operation: condominium majorities, temperature control and heat metering, public buildings | In force; first two sentences of para. 1 repealed by Legislative Decree 190/2024 |
| Art. 27 | Consumption limits set by the decrees of art. 4 | In force as text, but the paragraphs of art. 4 on the decrees for buildings are repealed |
| Art. 28 | Technical report on compliance with the requirements | Repealed by Legislative Decree 48/2020; now art. 8 of Legislative Decree 192/2005 |
| Arts. 29 and 30 | Acceptance testing of the works; energy certification of buildings | Repealed by Legislative Decree 192/2005 |
| Art. 31 | Operation and maintenance of systems; inspections at least every two years; nullity of contrary clauses | In force, except para. 2 |
| Art. 32 | Certification of the energy characteristics of components | In force |
| Arts. 33 and 35 | Suspension of works and changes ordered by the mayor, with a deadline to comply | In force, except paras. 1 and 2 of art. 33 |
| Art. 34 | Penalties, expressed in lire | Partly in force; many references to repealed articles |
| Art. 36 | Non-conformities found by the buyer or the tenant | In force |
| Art. 37 | Entry into force of Title II; repeal of Law 373/1976 and Law 645/1983 | In force |
The «Legge 10» technical report
For almost thirty years art. 28 required the owner to file with the municipality, together with the notice of commencement of works, in duplicate, the design of the works with a technical report certifying compliance with the law's requirements: one copy stayed with the municipality for inspections, the other, stamped as filed, went to the works supervisor on site. Hence the name the document still bears on site and in technical offices. Legislative Decree 48/2020 repealed the article: the obligation now lives in art. 8 of Legislative Decree 192/2005.
Today the designer, or the designers within their respective building, heating, electrical and lighting competences, puts the calculations and checks into the design technical report, and the owner or whoever holds the title files it in duplicate with the competent administrations, together with the declaration of commencement of works or the application for the building permit. The report templates are set by ministerial decree, currently the one of 26 June 2015 on templates and compilation methods. For new buildings and major renovations the report also includes the feasibility assessment of high-efficiency alternative systems (art. 8, para. 1-bis).
- 01DesignThe designer puts calculations and checks into the technical report, following the ministerial templates; for new buildings and major renovations they also assess high-efficiency alternative systems.
- 02FilingThe owner, or whoever holds the title, files it in duplicate with the declaration of commencement of works or with the application for the building permit.
- 03CompletionThe works supervisor certifies that the works conform to the design and to the report and submits the energy qualification certificate: without it, the declaration of completion has no effect.
- 04InspectionsThe municipality may carry out checks during the works or within five years of completion, also at the request of the client, the buyer or the tenant, at their expense.
Condominiums: the majorities for energy saving
Article 26 is the part of the law that is still applied every day. Paragraph 2 lowers the majority for interventions on buildings and systems aimed at reducing consumption and using renewable sources: resolutions are valid if adopted by a majority of those present, with votes representing at least one third of the building's value. The condition is that the interventions are identified by an energy performance certificate or an energy audit drawn up by a qualified technician. For temperature control and heat metering, with costs shared on actual consumption, paragraph 5 instead refers to the majorities of art. 1120, second paragraph, of the Civil Code.
Solar thermal, heat pumps, public buildings
After the repeals of Legislative Decree 190/2024, paragraph 1 of art. 26 keeps one practical rule: installing solar systems and heat pumps by qualified installers, intended solely for producing hot water and air in existing buildings and in the adjoining private open spaces, is considered an extension of the plumbing system already in place. Paragraphs 6–8 remain as design principles: heating systems in new buildings must allow temperature control and heat metering for each unit; public buildings or buildings in public use must meet their energy needs favouring renewable sources, unless there are technical or economic obstacles; the design of new public buildings must include every system and work useful for saving and rationally using energy.
Operation, inspections and penalties
While the systems are in operation, the owner, or a third party taking on the responsibility, must keep consumption within the efficiency limits set by the rules in force (art. 31, para. 1); municipalities with more than forty thousand inhabitants, and provinces for the rest of the territory, check combustion efficiency at least every two years, at the users' expense (para. 3); supply and operation contracts with clauses contrary to the law are null (para. 4). If non-conformities are found, the mayor suspends works in progress or orders, at the owner's expense, changes to completed works, setting a deadline to comply: once it expires, the penalty and enforced execution at the owner's expense follow (arts. 33 and 35). A buyer or tenant who discovers non-conformities must report them to the municipality within one year of finding them, or loses the right to damages (art. 36).
The penalties of art. 34 are still expressed in lire and largely refer to repealed articles. For the technical report, the certification of conformity and the energy performance certificate, the penalties applied today are those of art. 15 of Legislative Decree 192/2005: for example, 1,000 to 6,000 euros for a works supervisor who does not submit the certification and the qualification certificate before the certificate of occupancy.
Beyond Title II: renewable sources and the energy manager
Two provisions of Title I still have effects. Article 1 lists the renewable sources — the sun, the wind, hydraulic energy, geothermal resources, the tides, wave motion and the transformation of organic waste or plant products — and declares their use to be in the public interest and of public utility, treating the related works as urgent works that cannot be postponed. Article 19 requires anyone who in the previous year consumed more than 10,000 tonnes of oil equivalent in industry, or more than 1,000 in other sectors (residential, services, transport), to notify the Ministry by 30 April of the name of the technician responsible for the conservation and rational use of energy, the energy manager; municipalities may appoint one jointly.
Why it still matters
For buildings constructed or altered after 1991, the report filed under art. 28 is a design document kept in municipal archives: in a due diligence or in the design of a retrofit it can help reconstruct the planned build-ups and systems. And anyone working with condominiums still applies art. 26, paragraph 2, every time a meeting votes on an energy-efficiency intervention.
The consolidated text in force can be consulted free of charge on Normattiva, at the source given in this record.
Key points
TAV. K- Formally in force since 17/01/1991; Title II, on buildings, since 15/07/1991 (art. 37).
- The «Legge 10» technical report was born with art. 28, repealed by Legislative Decree 48/2020: it is now in art. 8 of Legislative Decree 192/2005.
- Condominiums: energy-saving interventions identified by an EPC or an audit are approved by a majority of those present with at least one third of the value (art. 26, para. 2).
- Solar thermal and heat pumps for hot water and air in existing buildings: an extension of the plumbing system (art. 26, para. 1).
- Public buildings: energy needs to be met favouring renewables, unless there are technical or economic obstacles (art. 26, para. 7).
- Non-conformities found by the buyer or the tenant: report to the municipality within one year (art. 36).
- It repealed Law 373/1976 and Law 645/1983 (art. 37).
Frequently asked questions
TAV. QDoes the «Legge 10» report still exist?
Yes, but no longer as art. 28 of Law 10/1991, repealed by Legislative Decree 48/2020. Today the design technical report is governed by art. 8 of Legislative Decree 192/2005 and drafted following the templates of the ministerial decree of 26 June 2015; the name «Legge 10» has stuck in everyday use.
When is the technical report not required?
For installing a heat pump with a thermal output of up to 15 kW and for replacing the heat generator below the threshold of art. 5, para. 2, letter g) of Ministerial Decree 37/2008 (art. 8, para. 1, Legislative Decree 192/2005).
What majority does a condominium need for an energy-saving intervention?
A majority of those present representing at least one third of the building's value, if the intervention is identified by an energy performance certificate or an energy audit by a qualified technician (art. 26, para. 2). For temperature control and heat metering, the majorities of art. 1120, second paragraph, of the Civil Code apply (art. 26, para. 5).
Has Law 10/1991 been repealed?
No: it is formally in force, but many provisions of Title II have been repealed (arts. 28, 29 and 30 and several paragraphs). Still in force are, among others, arts. 25, 32, 35, 36 and 37, most of arts. 26 and 31, paragraphs 3–5 of art. 33 and, in Title I, arts. 1 and 19.
What happens if the buyer discovers non-conformities with the law?
They must report them to the municipality within one year of finding them, even if earlier checks did not reveal them; otherwise they lose the right to damages from the client or the owner (art. 36).
Who must appoint an energy manager?
Anyone who in the previous year consumed more than 10,000 tonnes of oil equivalent in industry, or more than 1,000 in other sectors: by 30 April they notify the Ministry of the name. Without the notification they are excluded from the law's incentives (art. 19).
Glossary
TAV. G- Relazione tecnica «ex Legge 10»
- Design document certifying compliance with the requirements on energy consumption of the building and its systems; born with art. 28 of Law 10/1991, now governed by art. 8 of Legislative Decree 192/2005.
- Diagnosi energetica
- Analysis of a building's consumption drawn up by a qualified technician that identifies energy-saving interventions; together with the energy performance certificate, it is the precondition for the reduced majority of art. 26, para. 2.
- Contabilizzazione del calore
- Measurement of the heat used by each unit, to share heating costs on actual consumption (art. 26, paras. 5 and 6).
- Termoregolazione
- Temperature control for each unit; together with heat metering, it must be made possible in the heating systems of new buildings (art. 26, para. 6).
- Energy manager
- The technician responsible for the conservation and rational use of energy, whom large consumers must appoint and notify to the Ministry by 30 April (art. 19).
- Fonti rinnovabili
- Under art. 1: the sun, the wind, hydraulic energy, geothermal resources, the tides, wave motion and the transformation of organic waste or plant products; their use is in the public interest and of public utility.
- Tonnellata equivalente di petrolio (tep)
- Unit of energy equal to the conventional energy content of one tonne of oil; art. 19 uses it for the energy-manager thresholds.