How this node works
The most exposed point to water and impact: starter profile with a drip edge, a low-absorption XPS band straddling ground level, detachment from the soil.
Key points
- Masonry (substrate)
- Adhesive (bead + dabs)
- Insulation board (EPS)
- Reinforced base coat + mesh
- Finish
- XPS base band
- Starter profile + drip edge
- Ground level (detached)
Conceptual, language-neutral drawing for study and orientation — not an execution drawing. Dimensions and verifications belong to the designer.