Atlas of details · Other nodes

Bearing on the ring beam

D.01Clay-and-concrete floor slab
123456

How this node works

Over the support the moment reverses: the clay block is omitted (solid band) to resist the shear, and top reinforcement is placed to take the negative moment, tying the floor into the ring beam.

Key points

  • Load-bearing masonry
  • R.C. ring beam
  • Solid band (no infill blocks)
  • Top reinforcement (negative moment)
  • Collaborating slab
  • Joist bearing

Conceptual, language-neutral drawing for study and orientation — not an execution drawing. Dimensions and verifications belong to the designer.

Bearing on the ring beam — Clay-and-concrete floor slab | Architheca