How this node works
To cut impact noise the screed and the floor finish «float» on a continuous resilient layer, turned up at the wall with a compressible edge strip: no rigid bridge between floor and structure.
Key points
- Wall
- Compressible perimeter strip
- Continuous resilient layer
- Floating screed
- Floor finish
- Detachment from the wall
Conceptual, language-neutral drawing for study and orientation — not an execution drawing. Dimensions and verifications belong to the designer.