Politecnico di Milano · 2025 · Prova pratica

Reuse of a disused industrial complex on the edge of the Parco Sud

II session · section A · Tema 1Verified

What the track asks

The site is in Milan, in the south-western part of the city, near the Gratosoglio district. The property is industrial in origin and occupies a hinge position: on one side it borders the unitary fabric of the district, on the other the edge of the agricultural land of the Parco Sud. The historic morphology of the block is the recent construction of buildings within an open fabric, adapting to the new plots through gardens and private greenery. The brief gives a reasoned reading of the planning instrument sheet by sheet — geological feasibility in class III, inclusion in the consolidated urban fabric among the areas with a recognisable urban design, open-layout urban fabric, absence of administrative and protective constraints, height limits for air navigation, low landscape sensitivity requiring the opinion of the landscape commission — and on that basis asks for a mixed residential and commercial scheme reusing part of the existing buildings, with partial demolition not exceeding twenty per cent of the estimated existing gross floor area. The sizing is given: 9,000 sqm of residential gross floor area and 1,500 sqm of retail in units no larger than 200 sqm. The housing mix is prescribed by share and average size, every flat requires a double bedroom with en-suite bathroom and walk-in wardrobe, a second bathroom and a contained outdoor space, and the basement parking must serve both the dwellings and retail users.

Required drawings

Massing plan including the adjacent spaces so that the morphological choices can be assessed, at 1:500; ground floor plan with functional uses, basement access and external landscaping at 1:200; plan of the dwelling types provided and a drawing of at least one representative floor of their aggregation at 1:100; most significant section chosen by the candidate at 1:100; most significant elevation chosen by the candidate, set within the surrounding profiles, at 1:100. The first written test report fits on one folded sheet, four sides maximum, and must be accompanied by explanatory sketches.

Regulations this track calls into play

Editorial anchoring: the rules a well-prepared candidate should have in hand for this theme, each with its current status.

D.P.R. 380/2001Consolidated Building Act (Testo Unico Edilizia)In forceD.M. 1444/1968Mandatory limits of density, height, distance between buildings and urban standardsIn forceD.Lgs. 42/2004Code of Cultural Heritage and LandscapeIn forceD.M. 236/1989Technical requirements for the accessibility of private buildingsIn forceD.M. 03/08/2015Technical fire-prevention standards (Italian Fire Prevention Code)In forceD.M. 17/01/2018Technical Standards for Construction (NTC 2018)In forceD.M. 26/06/2015Minimum energy-performance requirements for buildings (the 'minimum requirements decree')In forceD.Lgs 114/1998Legislative Decree 31 March 1998, no. 114 — Reform of the rules governing the commerce sector ("Bersani Decree")In forceD.M. 05/07/1975Minimum height and main hygiene and health requirements of habitable roomsIn force

This theme, across the archive

The same brief seen by theme: every other past exam that asked for it, and the norm kit they share.

Reuse & refurbishmentCollective housingRetail & production

Full official text at the university source

Practice this track in the exam room

All tracks

Editorial summary for study orientation — not the official text and not legal advice. Formats change: check the current ministerial ordinance and your university.

Reuse of a disused industrial complex on the edge of the Parco Sud — Politecnico di Milano · 2025 II session · Prova pratica | Architheca